Skip to content
-
- AMC FOR A PERIOD OF 2 YEARS OF IGBT PROPULSION SYSTEM FOR 6000HP LOCOMOTIVES AT ELECTRIC LOCOSHED,LALLAGUDA,HYDERABAD.
- AMC FOR A PERIOD OF 2 YEARS OF IGBT PROPULSION SYSTEM FOR 6000HP LOCOMOTIVES AT ELECTRIC LOCOSHED,ROYAPURAM ALONG WITH COMMISSIONING SUPPORT AT ICF,CHENNAI.
- AMC FOR A PERIOD OF 2 YEARS OF IGBT PROPULSION SYSTEM FOR 6000HP LOCOMOTIVES AT ELECTRIC LOCOSHED,GOMOH ALONG WITH COMMISSIONING SUPPORT AT CLW,CHITTARANJAN & ASANSOL.
- AMC FOR A PERIOD OF 2 YEARS OF IGBT PROPULSION SYSTEM FOR 6000HP LOCOMOTIVES AT ELECTRIC LOCOSHED,KANPUR ALONG WITH COMMISSIONING SUPPORT AT DLW,VARANASI.
- AMC FOR A PERIOD OF 2 YEARS OF IGBT PROPULSION SYSTEM FOR 6000HP LOCOMOTIVES AT ELECTRIC LOCOSHED,KALYAN & VADODHARA
- AMC FOR A PERIOD OF 2 YEARS OF IGBT PROPULSION SYSTEM FOR 6000HP LOCOMOTIVES AT ELECTRIC LOCOSHED,HOWRAH & TATANAGAR ALONG WITH COMMISSIONING SUPPORT AT DANKUNI.
- INSTALLATION SERVICES FOR 145KV SF6 BREAKERS AT COROMANDAL FACTORY SWITHYARD,KAKINADA.
- RETROFITTING OF 245KV CT’S AT KTS AND BOMMURU SWITCHYARDS IN LOWER SILERU,DONKROY.
- ERECTION,TESTING & COMMISSIONING OF 245 KV CIRCUIT BREAKERS ALONG WITH TERMINAL COONECTIONS AT OBRA,UPRVUNL,U.P
- TOTAL INSTALLATION AND TESTING OF 66/11KV SWITCHYARD AT BEST STEEL LOGISTICS,MALUR,KARNATAKA.
- ERECTION,WIRING AND FITTING SERVICES AT 765KV PLANT AT AKOLA,MAHARASTRA.
- INSTALLATION SERVICES AT 220KV CVT’S AT RRVUNL,KOTA,RAJASTHAN.
- RETROFITTING OF 245KV CB’S AT SAIL,SALEM,TAMILNADU.
- DISMANTALLING ERECTION AND TESTING OF 132KV CB AT M/s NEEPCOL,AGARTALA,TRIPURA.
- RETROFITTING OF 220KV CB & CVT AT TSGENCO KTPS KOTHAGUDEM,TELANGANA.
- RETROFITTING OF 245KV CB’S AT NEEPCO,AGBP,DIBRUGARH.
- INSTALLATION & ELECTRICAL TESTING OF ONGC VA & S1 DEVELOPMENT PROJECT AT ODALAREVU ONGC PLANT ,AMALAPURAM , INDIA
- TESTING & COMMISSIONING OF KOLKATA METRO RAIL SUBSTATIONS IN KOLKATA EAST ON BEHALF OF SIEMENS.
- AMC OF BHEL IGBT PROPULSION SYSTEM FOR 6000HP LOCOMOTIVES AT DIFFERENT LOCATIONS ALL OVER
- TESTING & COMMISSIONING OF 50 MW SOLAR PLANT AT TANDUR , TELANGANA ,
- INSTALLATION & TESTING OF AUTOMATIC FIRE SUPRESSION SYSTEM AT G1 PLANT FOR ALREADY EXISISTING FIRE & GAS SCHEME AT ONGC OLD PLANT , ODALAREVU ,AMALAPURAM,
- TESTING & COMMISSIONING OF HT CABLES ,HT PANELS FOR 1 X 4.8MW PLANT AT ANDHRA ORGANICS, PYDABHIMAVARAM ,
- SRIKAKULAM ,INDIA.
- TROUBLE SHOOTING TESTING & COMMISSIONING OF 33 / 6.6 KV POWER TRANSFORMERS AT KRISHNA PATNAM PORT , NELLORE ,
- RE-INSTALLATION & MAINTENANCE OF INTERIOR & EXTERIOR AIR COOLING SYSTEM FOR TOTAL ONGC PLANT AT ODALAREVU , AMALAPURAM , INDIA
- SOIL RESISTIVITY TESTED AT 2 X 300MW THERMAL POWER PROJECT AT NAWAPARA , RAIGARH ,
- TESTING & COMMISSIONING OF PROTECTION RELAYS AT GREENKO ENERGIES PVT .LTD. AT CHENNUR , KADAPA ,
- CONFIGURATION & TESTING OF REF & REM MODEL RELAYS AT HPCL , VIZAG ,
- TESTING & COMMISSIONING OF 2 X 8000 / 10000 KVA HT PANELS AT VEDANTHA ALLUMINIUMLIMITED,LANJIGARH , ODISSA ,
- TESTING & COMMISSIONING OF 132 /11 KV SWITCH YARD AT KISAN SAHAKARICHINIMILLS AT SATHIAON , UTTARPRADESH.